Plant Parts
Complete List attached
The goods subject to this lot are stored at a facility managed by a third-party company.
The successful bidder can choose between two collection methods, "Option A" and "Option B"
Option A: The successful bidder may independently handle the movement and loading of the awarded goods using their own means, under their own exclusive responsibility, only upon presentation of all mandatory safety documentation. The form with the list of required documents is available in the lot sheet.
Option B: At the time of collection, the successful bidder must pay directly to the aforementioned company an amount equal to Euro 30.00 (thirty/00), + VAT for each hour, or fraction thereof, necessary to complete the collection operations (transfer/movement/loading/unloading). The total cost, determined based on the actual time taken, will be invoiced and collected directly by the appointed company at the time of collection, and remains entirely the responsibility of the successful bidder.
Gobid International Auction Group S.r.l. operates solely as a mere executor of an assignment aimed at the competitive sale of the assets belonging to the active mass of the Procedure, therefore remaining unrelated to any custody and/or movement activities of the goods and, consequently, to the management and invoicing of the related costs, times, and operational methods, which remain the exclusive responsibility of the appointed third-party company.
Italiano
English
Français
Español
Euskara
Català
Deutsch
Nederlands
Português
Shqiptare
Български
Čeština
Ελληνικά
Hrvatski
Magyar
Македонски
Polski
Română
Српски
Slovenský
Slovenščina
Türkçe
Русский
Dansk
Suomalainen
Íslenskur
Norsk
Svenska
Lombard
Marchigiano
Pugliese
Romano
Siciliano
Toscano
Veneto