n. 1 SWF embroidery machine mod. Man-12, year 2018 User manual: not present CE Declaration of Conformity: not present
n. 1 GRAPHTEC digital die-cutting machine mod. CE6000-60-PLUS, year 2018 User manual: not present CE Declaration of Conformity: not present
n. 1 First mod. laminator SURELAM III 540, year 2018 User manual: not present CE Declaration of Conformity: not present
n. 1 KEENCUT panel cutter mod. EVOLUTION E2-310 CM-124, year 2018 User manual: not present CE Declaration of Conformity: not present
n. 1 CANON photocopier mod. IMAGEPRESS C600I, year 2015 - The display does not turn on - User manual: not present EC Declaration of Conformity: not present
"cartomac" brand printing machine mod. combytype blue and gray color dimensions 70 x 120 x 74 (to be revised) - ref. 4 n. 1 machine for washing printing systems / cliche 'model flexo cleaner l.c.o. 120, brand ist italia technological systems - ref. 16 n. 1 machine mounts cryptographic cliche brand stimount 100 / po matr. 014 / mc - ref. 22
plotter LECTRA SYSTEM mod. FLYPEN n ° 2532, year 1999, CE
digitizing table LECTRA mod. 34600 CALCOMP, matr. 4FS1594457
5 pc (2 HP VECTRA VE, 1 HP VECTRA; 1 IMB NETVISTA, 1 IBM NETFINITY 3500)
3 CRT monitor NEC MULTYSINC V520, 1 CRT monitor DAEWOO CMC 1420AVG, 1 CRT monitor HP - ref. 17 / ME
unpackaged loose cardboard, (10000 pieces) of various shapes and sizes - ref. 60 bulk carton packed. (5000 pieces) of various shapes and sizes - ref. 61 n. 1 manual shear paper cutter - ref. 56 n. 1 track cutter VAGGELLI s.n. 5153 - ref. 57
Xerox mod. Igen 3 digital printing system, year 2009, serial number 803312
- The property is in fair condition
turns out to be mounted
Ignition not possible due to lack of electricity -
Use and maintenance manual present
Declaration of Conformity Present
- The buyer undertakes to collect, at his own care and expense, within the mandatory deadline of 15/07/2023 the good in question from the place indicated for collection. It remains the responsibility of the Property to fulfill any charges connected to the deposit of the asset accrued up to that day. The buyer declares for all purposes of the law and reiterates that the movement, loading onto means of transport, transport, any disassembly of the necessary asset and any activities on the property as well as its necessary restoration, and any necessary operation also only when it is made available, it will be at the buyer's entire expense, even if specific instructions from the manufacturers of the goods are not available or available -
In this regard, it should be noted that inside the premises where the goods are located there is a metal structure with a door, which, for removal purposes, must be disassembled and reassembled, restoring the situation as indicated above. The contractor will therefore be required to carry out all the operations necessary to collect the awarded asset, at his own expense, and to take steps to request any permits to occupy public land from the relevant Municipality, where necessary.