n. 1 lighting system consisting of 100 recessed spotlights complete with two general panels composed of circuit breakers, switches, socket points - ref. 64
Photovoltaic panel production line, distributed on four distinct rolling lines, of different production capacity, supplied upstream by three automatic stringing machines with a production capacity varying between 4 and 5 bushbars controlled by two "Kuka" robotic arms;
Downstream of the formal lamination process, "core 6" (3 places) and "core 4" (2 places), the line is also equipped with two framing machines, plus a station for the application of the rear junction box and a system verification / testing of the finished product.
The maximum production capacity when fully operational is around 2,400 cells per hour, or about 33 modules per hour.
This therefore translates, at the rate of 220 working days of production in three continuous shifts of eight hours, in a value that is around 52.2MW of annual production, or about 174,240 modules of 60 cells of about 5W / cell, with average unit power of photovoltaic module of 300W / module.
The line includes:
ball table (manual handling of PV modules) - ref. 221
strapping machine - ref. 225
module cleaning table - ref. 371
5Bus Bar UPGRADE KIT - ref. 492
product line Photovoltaic panels (first production line in 2008) - ref. 27
digital soldering station (first production line 2008) - ref. 29
p energy machinery (automatic loading and unloading laminator) - ref. 55
string repair station - ref. 142
2BG laminator matr. 090102-02 - ref. 172
stringing machine - ref. 208
light table - ref. 209
transfer - ref. 210
TRIULZI windshield washer system - ref. 212
trimming and taping table - ref. 213
ET800S stringing machines in number 2 - ref. 414
ET800S stringing machine - ref. 415
automatic production line (Penergy) - ref. 442
plant prod. P energy - ref. 451
Ecoprogetti ribbon welder kit - ref. 457
ribbon guide plate - ref. 477
line 2bg - ref. 470
- The line is in perfect state of maintenance and conservation -
The lot includes n. 2 photovoltaic power plants of 97.02 kWp and 15.435 kWp respectively (tot. about 112 kWp)
In the first plant the photovoltaic modules are installed on triangular structures on the roofs of two stables, with an inclination of about 20 ° and orientation to the south.
The photovoltaic modules are connected in series to form strings connected in turn to n. 6 inverters;
The system is completed by the parallel string panels of each individual inverter, the alternating current switchboards, the isolation transformer, the monitoring system and the production counter of the system.
In the second plant the modules are installed in a coplanar manner to the existing flap of the building facing south and with an inclination of about 10 °;
The system is completed by the inverter, the direct current electrical panel, the alternating current electrical panel, the monitoring system and the production counter, installed on the wall inside the building
Removal of movable goods assistance costs on Euro 1.500,00 are required
It should be noted that lot 1 insists on property owned by third parties without surface rights and the credit for the contribution received from the Energy Services Manager has been transferred to a credit institution.
For further information see the appraisal in the annex
Thermoelectric plant fed by biogas source with anaerobic digestion, single digester
The main plant components are:
- digester with gasometer biogas accumulation
- biomass loader
- generator set and cogeneration
- biogas treatment and purification system
- Gas Analysis system
- safety torch
- fire system
- technical pumping room and compressed air system
- electrical cabin with control panels and workstation
- electrical transformation cabin
Connected to the plant there are a liquid collection tank, a trench for the storage of the separated solid and a liquid / solid separator
The incentive electric power is equal to 132kW / 165 kVA, while that currently installed is equal to 110 kW / 137.5 kVA
Removal of movable goods assistance costs on Euro 1.500,00 are required
For further information see the appraisal in the annex
installed power 18.9 kW
expected annual production 20790 kWh
connection to the low voltage LV distribution network
partially architecturally integrated type of installation
gross area occupied by the plant 140 square meters
monocrystalline silicon photovoltaic modules, n. 108 modules, module power 175 kW
n. 3 inverters
For further information see the documentation in the annex
THE SALE NOTICE AND THE OFFER FORM CAN BE CONSULTED ON THE AUCTION CARD
Powder coating line - continuous line with monorail overhead conveyor
- Adjustable speed from 1-4 m/minute Max piece dimensions: 1800 Length x 800 l x 1400 h
Composition: a) Stainless steel pre-treatment tunnel 3 zones (one active zone and 2 rinsing zones) redone in 2018 Thermal power 349 KW- Electric power 46 Kw; b) Drying oven redone in 2016 Thermal power 290 KW - Electric power 15 Kw; c) Nordoson powder painting booth with PVC sandwich panels, rapid color change, with 2 reciprocators, cyclone recovery system year 2005; d) Exhaust air filtering system 10.000m³/h Electric power 18 Kw. e) Polymerization Oven T. Max 250°
the plant is located in Nesvady (SK) and is operational